 Wrike Software Review 2026: Features, Integrations, Pros & Cons

Last updated on November 9, 2026

Provider data verified by our Software Research team, and reviews moderated by our Reviews Verification team.

[Description](#description)[Use cases](#use-cases)[Alternatives](#alternatives)[FAQs](#faqs)[Users](#users)[Pros and Cons](#pros-cons)[Features](#features)[Pricing](#pricing)[Integrations](#integrations)[Support](#support)[Reviews](#reviews)

Wrike

## What is Wrike?

Wrike is the trusted work delivery platform where AI optimizes project management and extends what people can accomplish. By centralizing all projects in one governed, context-rich environment, Wrike helps organizations streamline collaboration, project planning, and task execution while maintaining the control and accountability that successful projects demand. Key features include AI Agents to build plans and assess risk, Wrike Copilot, workflow automations, customizable dashboards, Gantt charts, and advanced reporting. Powered by the Wrike Work Intelligence® Graph, every action becomes part of the auditable record of how work gets done. More than 20,000 organizations worldwide trust Wrike.

## What is Wrike used for?

[Project Management](https://www.capterra.com/project-management-software/)[Task Management](https://www.capterra.com/task-management-software/)[Workflow Management](https://www.capterra.com/workflow-management-software/)

Recognitions

Shortlist

Overall rating

Based on 3,046 user reviews

Reviews sentiment

Positive

89%

Neutral

7%

Negative

3%

Pros & cons

Centralized real-time team collaboration

Comprehensive project visibility tools

High and inflexible pricing structure

Frequent minor bugs and glitches

Starting price

$10

Per User, Per Month

Free trial  
available

Capterra Shortlist charts the highest-rated and most popular products...

-   Business Management / 2026
-   Professional Services Automation / 2026
-   Project Management / 2026
-   Resource Management / 2026
-   Task Management / 2026
-   Time Tracking / 2026
-   Advertising Agency / 2025
-   Agile Project Management / 2025
-   Brand Management / 2025
-   Business Process Management / 2025
-   Gantt Chart / 2025
-   Idea Management / 2025
-   Kanban Tools / 2025
-   OKR / 2025
-   Product Lifecycle Management / 2025
-   Product Management / 2025
-   Project Planning / 2025
-   Project Portfolio Management / 2025
-   Remote Work / 2025
-   Risk Management / 2025
-   Strategic Planning / 2025
-   Workflow Management / 2025

Our "Best of" badge program showcases products with the highest ratings...

Our "Best of" badge program showcases products with the highest ratings...

-   MRM / 2026

## Wrike alternatives

Highest Rated

[4.6 (6,134)](https://www.capterra.com/p/147657/monday-com/reviews/)

Starting price

$9.00

Per User, Per Month

Pricing Options

Free Trial

Free Version

User Rating

94%

of reviewers

rated it above 4 stars

[4.5 (3,579)](https://www.capterra.com/p/79104/Smartsheet/reviews/)

Starting price

$9.00

Per User, Per Month

Pricing Options

Free Trial

Free Version

User Rating

92%

of reviewers

rated it above 4 stars

[4.5 (878)](https://www.capterra.com/p/169455/Zoho-Projects/reviews/)

Starting price

$4.00

Per User, Per Month

Pricing Options

Free Trial

Free Version

User Rating

92%

of reviewers

rated it above 4 stars

[4.6 (2,251)](https://www.capterra.com/p/146652/Airtable/reviews/)

Starting price

$20.00

Per User, Per Month

Pricing Options

Free Trial

Free Version

User Rating

96%

of reviewers

rated it above 4 stars

[View all alternatives](https://www.capterra.com/p/76113/Wrike/alternatives/)

## FAQs about Wrike

Overview

### What problems does Wrike solve?

Wrike solves scattered task ownership, disconnected project communication, and limited visibility into deadlines, dependencies, workloads, and approvals. It centralizes requests, files, comments, and status updates while automating repeatable workflows. PMOs, marketing and creative teams, operations leaders, and cross-functional project teams benefit when coordinating high volumes of complex work.

Answer based on 2157 reviews

Overview

### Which roles and teams benefit most from Wrike?

Wrike is most used by project managers, marketing teams, and operations leaders coordinating tasks, deadlines, and cross-functional approvals. Software developers, web developers, and designers track production work and handoffs, while CEOs, owners, and directors use dashboards to monitor priorities, team capacity, and delivery progress across client and internal projects.

Answer based on 2648 reviews

Overview

### What company size and industries is Wrike built for?

Wrike is built primarily for small businesses, which represent 60% of reviewers, with Marketing and Advertising leading at 13%. It also supports enterprises (22%) and midsize businesses (19%), serving computer software and IT services organizations at 9% each, alongside creative, product, client services, operations, HR, legal, finance, healthcare, education, media, and manufacturing teams.

Answer based on 3044 reviews

Features and Usability

### What are the key features of Wrike?

Wrike includes task management with subtasks, assignees, custom statuses, and real-time progress tracking. Its project planning and scheduling features use Gantt charts, dependencies, milestones, and calendars to manage timelines across multiple projects. Collaboration centers on task comments, @mentions, file feedback, and shared updates, while online time tracking records work by task or project.

Answer based on 315 reviews

Pricing

### How much does it cost and what fees or limitations are included?

Wrike offers the Team plan at $10 per user/month and Business at 25 per user/month. A free version and free trial are available. Team supports 2–15 users, 20 free collaborators, 2 GB storage per user, and 50 automation actions monthly; reviewers say advanced features can require higher-priced plans.

Answer based on 453 reviews

Integrations

### Which third-party tools and platforms does Wrike integrate with?

Wrike integrates with over 130 integrations, including Microsoft Outlook, Slack, Google Drive, Microsoft Teams, Gmail, Microsoft SharePoint, Adobe Creative Cloud, and Box. Its connections cover communication, email, file storage, and creative-work tools, while the catalog also includes platforms such as AWS Lambda, Airtable, Asana, and Bitbucket.

Answer based on 333 reviews

Getting Started and Support

### How easy is it to onboard and train a team on Wrike?

Wrike offers in-person training, live online sessions, webinars, documentation, and videos. Reviewers say basic task management can be learned quickly, including by nontechnical users, but its many features can overwhelm new users. Admins and teams configuring workflows, dashboards, automations, and governance generally need more structured, ongoing training.

Answer based on 322 reviews

Getting Started and Support

### What customer support options does Wrike offer, and how do users rate the experience?

Wrike offers email/help desk, FAQ/forum, knowledge base, phone support, 24/7 live representative assistance, and chat. Users often describe support as quick, knowledgeable, and helpful, particularly during onboarding and troubleshooting. However, some report slow or inconsistent responses, difficulty reaching representatives, generic guidance, and unresolved billing or complex technical issues.

Answer based on 202 reviews

Security

### How does Wrike handle data security and access control?

Wrike uses role- and folder-based permissions, password access, two-factor authentication, encryption, and audit trails to protect project data and control collaboration. Reviewers also cite secure file sharing and task-level access controls. However, permission settings can be complex, inherit downward through folders, and may allow overly broad visibility or timeline editing; two-factor authentication may require an enterprise plan.

Answer based on 51 reviews

## Who uses Wrike?

Based on Capterra reviews from the past year

Talk to a software expert

to get a free software list  
tailored to your business needs

## Pros and Cons

Centralized real-time team collaboration

93% positive reviews out of 491

Most reviewers indicate team collaboration is seamless, with unified communication, document sharing, and easy remote teamwork.

Mohanaraman L.

SENIOR HR, 51 - 200 employees.

"With features like shared workspaces, task discussions, and document sharing, Wrike facilitates effective collaboration among team members, which is particularly beneficial for teams working remotely or in different locations."

High and inflexible pricing structure

49% negative reviews out of 281

Some users report pricing is costly, with limited lower-tier features and challenging contract terms for small businesses.

Marylet M.

Owner, 1 employee.

"Pricing plans might not be appropriate for startups or small businesses, and the interface might confuse novice users."

Comprehensive project visibility tools

96% positive reviews out of 309

Most reviewers find project tracking provides real-time overviews, detailed timelines, and clear progress monitoring for teams.

Ghassen K.

Generative AI Instructor, 11 - 50 employees.

"Wrike has project visualization dashboards and reports which allow us to achieve a clear overview of our projects activities making it easy to track our progress."

Frequent minor bugs and glitches

61% negative reviews out of 185

Most users report bugs and issues occasionally disrupt workflow, causing delays, interface inconsistencies, and occasional crashes.

Matilda R.

Communciations Coordinator, 51 - 200 employees.

"I find that there are lots of bugs and it doesn't work the same way it does on desktop."

Highly customizable workflow automation

95% positive reviews out of 238

Most reviewers describe workflow management as flexible, enabling tailored processes, automation, and efficient task organization.

Stefano S.

Product manager, 10,001+ employees.

"We can create custom workflows that actually match our team's unique processes rather than being forced into a "one size fits all" structure."

Overwhelming and cluttered notifications

45% negative reviews out of 116

Some users say notifications generate excessive alerts, limited customization, and important updates can be missed or delayed.

Ihor B.

Senior Software Engineer, 201 - 500 employees.

"One of my pet peeves specifically: Notifications are excessive and lack intelligence."

## Features

AI summary

Based on 29,194 Project Management reviews

Capterra data shows that buyers of Project Management software rank the following features as their top priorities:

-   **Deadline Management** (**59%** of reviewers rated this feature as critical)
-   **Project Time Tracking** (**62%**)
-   **Project Time Tracking** (**62%**)

Wrike supports all three features that reviewers identify as most important: **Deadline Management**, **Project Time Tracking**, and **Project Time Tracking**. Together, these capabilities help teams stay on schedule, monitor time spent across projects, and keep work moving with better visibility, helping businesses improve planning, track effort accurately, and meet delivery goals.

Deadline Management

4.2 (5)

80.00% of 5 reviewers that rated this feature as important or highly important

Specify or track the date/time a project, task, etc., is due for completion

Project Time Tracking

4.6 (36)

61.11% of 36 reviewers that rated this feature as important or highly important

Measure time to completion or hours worked for projects

Time Tracking

4.7 (34)

79.41% of 34 reviewers that rated this feature as important or highly important

Measure and track time including hours worked and paid time off (PTO)

Assignment Management

4.7 (3)

0.00% of 3 reviewers that rated this feature as important or highly important

Assign issues and tasks based on availability or required skills

Task Management

4.6 (875)

67.77% of 875 reviewers that rated this feature as important or highly important

Wrike offers you a comprehensive way to organize, assign, and track tasks, including subtasks, deadlines, priorities, and attachments. Reviewers appreciate the intuitive interface, real-time updates, customizable workflows, and the ability to collaborate and share tasks easily across teams.

Project Planning/Scheduling

4.5 (631)

64.66% of 631 reviewers that rated this feature as important or highly important

Wrike helps you plan and schedule projects with tools like Gantt charts, timelines, and dashboards. Reviewers appreciate the structured organization, flexible scheduling, and real-time progress tracking, but some wish for better export options and deeper integrations with Google Calendar.

Wrike 353 features

### All Features
- @mentions: An @mention is a way to tag or notify a specific person about a message/post
- Access Controls/Permissions: Define levels of authorization for access to specific files or systems
- Accounting: Built-in accounting to manage ledger, accounts payable/receivable, financial reports, etc.
- Accounting Integration: Integrate with a third-party accounting system
- Activity Dashboard: Dashboard to view the status of ongoing processes, identify current incidents and track past activities
- Activity Tracking: Track and document all activities across devices, networks, and other systems
- Activity/News Feed: Continuous profile-based stream of news and activity
- Ad hoc Reporting: Generate one-off reports that meet information requirements
- Agile Methodologies: Iterative project Management approach that involves technologies such as Kanban, Scrum, XP, APF, XPM and more
- AI Copilot: A virtual assistant that uses AI to pursue goals and complete tasks on behalf of users
- AI/Machine Learning: Software program that continuously adjusts its behavior based on observed data
- Alerts/Escalation: System alerts about the need to escalate an issue or request
- Alerts/Notifications: Alerts or notifications of various types such as pop-up messages, sounds, banners, or badges
- API: Application programming interface that allows for integration with other systems/databases
- Applicant Tracking: Find and manage potential candidates and their applications and resumes through the recruiting life cycle
- Approval Process Control: Manage the process of evaluating documents or requests submitted for approval
- Approval Workflow: Route documents and other data through one or more stakeholders for review and approval
- Archiving & Retention: Moving and separately storing data that is not actively used or continuous storage of data for compliance purposes
- Asset Lifecycle Management: Manage assets throughout their lifecycle to optimize profit
- Asset Tracking: Monitor the usage of assets, such as equipment, tools, software, etc., throughout their lifecycle
- Assignment Management: Assign issues and tasks based on availability or required skills
- Attendance Tracking: Track the attendance of specific individuals or groups
- Audit Management: Plan, schedule, and execute organization's accounts and assets to ensure compliance with policies and laws
- Audit Trail: A record of all activities within the system, including user access, changes made, etc.
- Automated Scheduling: Automatically create schedules based on business needs or employee availability and qualifications
- Automatic Backup: Data is backed up automatically to prevent data loss
- Availability Management: Monitor and analyze the availability of resources to help plan and streamline the service delivery to clients
- Backlog Management: The process of evaluating, scheduling, and assigning tasks that have been put on the back burner in favor of higher priority items.
- Bar Chart: A way to visually represent data via blocks the length of which correlates with the values they represent
- Benchmarking: Compare key metrics for the business against prominent players in the industry
- Bid Management: Share bid details, archive bids, and create bid requests to assist in bid solicitation and quote comparison
- Billable & Non-Billable Hours: Track billable hours and/or non-billable expenses for work performed
- Billable Items Tracking: Track the list of items required to be billed/invoiced to clients
- Billing & Invoicing: Create, manage, and send invoices or bills to customers
- Brainstorming: Group collaboration to solve ideas in a productive and concentrated manner.
- Brand Management: The process of developing, monitoring, and maintaining the brand value, reputation, and awareness across the target audience.
- Budget Management: Forecast, allocate funds, organize financial resources and report & analyze project's income and expenditure
- Budget Tracking: Track actual spending to ensure it's in line with the planned budget
- Budgeting/Forecasting: Create budgets based on historical data and future projections
- Bug Tracking: Monitor and track bugs and issues in the system.
- Bug/Issue Capture: The creation of a bug/issue ticket, submitted by a team member, customer or end user
- Business Process Automation: Helps automate and manage information, tasks, and procedures by establishing routines and patterns associated with processes
- Calendar Management: Track and manage schedules and meetings via an integrated calendar
- Calendar Sync: Synchronize with other calendars to view mutual availability and schedules
- Calendar/Reminder System: Notifications/alerts for upcoming events or tasks
- Campaign Management: Create a collection of marketing actions to complete specific goals and plan and analyze campaign results
- Campaign Planning: Plan and strategize marketing campaigns
- Capacity Management: Monitor service demand and performance to plan for adequate resources that meet business needs
- Capacity Planning: Determine and plan production capacity based on changing demands
- Case Management: Work on a set of tasks related to a particular charge, patient, legal issue or any other complex entity or process
- Change Management: Track and monitor efficient handling of all changes/transitions
- Change Order Management: Tracks all change orders submitted across projects and updates the budget to reflect the most recent costs
- Change Tracking: Track changes in laws and regulations and compare previous legislation to current legislation
- Channel Management: Manage various distribution channels, build relations with channel partners, and track their performance
- Charting: Manage patient documentation describing all clinical interactions, diagnoses, procedures, medications, etc.
- Chat/Messaging: Communicate using direct chat or messages within the system
- Client Management: Manage contact details and communication with clients
- Client Portal: Private online space that lets businesses securely share documents and provide information access to clients
- Clock In/Out: Track employees' arrival and departure timings for payroll purposes
- Collaboration Tools: Provides a channel for team members to share AI models, media files, communicate, and work together
- Color Codes/Icons: A way to visually represent data where different categories of items are marked with different colors
- Commenting/Notes: Leave comments and notes on documents for others to view
- Commercial: Specialized for organizations who focus on commercial projects and processes
- Communication Management: Manage and track all internal and external communication conducted via calls, email, text, or chat
- Compliance Management: Track and manage adherence to policies for any service, product, process, or supplier
- Compliance Tracking: Track and report regulatory data to either internal management or external stakeholders
- Conditional Logic: Capability of a software or system to make decisions and perform actions based on specified conditions
- Configurable Workflow: Configure existing workflows to meet your organization's needs
- Contact Database: Centralized database of stakeholders and their contact information such as names, address, phone number etc.
- Contact Management: Manage, organize, and store contact information
- Content Library: Centralized repository to store content and assets
- Content Management: Handles digital content throughout its lifecycle, from creation and storage to distribution and archiving
- Content Publishing Options: Facilitates online authoring and publishing of the content
- Contract/License Management: Track, store, and access client contracts or licenses
- Contractor Management: Specialized for general contractors/sub-contractors (those who conduct work on a contract basis)
- Corrective and Preventive Actions (CAPA): Investigate and take action at root cause or error in processes to prevent recurring issues
- Cost Estimating: Forecast the cost and resources required to complete a project
- Cost Tracking: Process to track, record, and analyze expenses that occurred over the entire duration of a given project
- Cost-to-Completion Tracking: Forecast of the expenses necessary for project completion
- Customer Journey Mapping: Visualize and analyze customer experience across all touchpoints and channels
- Customizable Branding: Add customized logos and colors to align with company branding
- Customizable Dashboard: Alter the layout and content of dashboards
- Customizable Fields: Customize data fields to support various needs and use cases
- Customizable Forms: Customize contracts and forms to collect specific information
- Customizable Reports: Alter the layout and content of reports
- Customizable Templates: Pre-designed layouts that can be customized to match preferences and requirements
- Customization: Create labels for products that contain required information such as colors, sizes, dates, etc.
- Daily Reports: A document that lists daily activities or maintains a record of all events that happened in a day
- Dashboard: Assembly of graphs and charts for visualizing and tracking statistics/metrics
- Dashboard Creation: Creation and customization of dashboards
- Data Aggregation: Collect, process and structure data from multiple sources for further analysis
- Data Connectors: Connect to big data sources
- Data Extraction: Automatically retrieve and pull information from documents, websites, images, data sets, and other sources
- Data Import/Export: Import and export data to and from software applications
- Data Integration: Combining data from different sources and providing a unified view
- Data Management: Ability to handle large datasets
- Data Security: Protect sensitive data for digital privacy
- Data Synchronization: Synchronizing data between two or more devices/systems and automatically updating changes to maintain consistency
- Data Visualization: Graphical representation of data
- Deadline Management: Specify or track the date/time a project, task, etc., is due for completion
- Dependency Tracking: Track and manage task relationships and dependencies
- Diagramming: Enables schematic data presentation through org charts, mind maps, flowcharts, and process diagrams.
- Digital Asset Management: Manage digital assets
- Discussions/Forums: Online forums/groups where users can ask questions, share ideas, best practices, etc.
- Document Management: Store, manage, and track all electronic documents in a centralized location
- Document Review: Review and analyze existing information across documents
- Document Templates: Customizable sample documents that contain placeholder text or a standard layout that can be repeated for each new file
- Drag & Drop: Assemble applications and processes by dragging over and arranging pre-built components
- Due Date Tracking: Ability to identify, sort on and alert participating parties about the approaching date by which action has to be taken
- Electronic Forms: Digital forms that are shared and accessed online
- Email Management: Manage, store and organize emails within the system or via third-party apps
- Email-to-Task Conversion: Convert emails into tasks
- Employee Database: Electronic storage of staff/employee contact information and job status in a centralized repository
- Employee Directory: Access names, contact information, and roles of employees in a centralized repository
- Employee Management: Track employee schedules, availability, and performance across projects and tasks
- Employee Onboarding: Process of familiarizing new employees with the company, their position, and responsibilities
- Employee Portal: Online portal where employees can access and track their own information
- Employee Profiles: Centralized storage for employee data, records, and performance metrics
- Employee Scheduling: Assign working shifts or tasks to employees based on their availability
- Employee Time Tracking: Track and measure time worked for employees
- Engagement Tracking: Tracks metrics that provide insight into how a user interacts with any interface or product
- Equipment Tracking: Track the location of specific equipment at all times
- Estimating: Estimate expected cost based on various factors before a project begins
- Event Logs: A chronological record of actions or occurrences within a network, software, or process
- Event Marketing: Plan marketing campaigns for events
- Event Triggered Actions: Predefined actions automatically performed on the occurance of specific events
- Expense Management: Plan, pay and track business related expenses.
- Expense Tracking: Monitor and record expenses such as purchases or charges incurred
- Feedback Management: Collecting, analyzing, and utilizing feedback from users or customers to improve a product or service
- File Management: Create, save, and store files
- File Sharing: Public or private sharing of digital files such as documents, audio/video, images, and more
- File Transfer: Move files across different systems or networks
- Filtering: Find & retrieve relevant data or documents
- Financial Analysis: Evaluate units, projects, budgets, and other finance-related data to gauge their performance and potential risk
- Financial Management: Plan, manage, and track the financial activities of an individual or organization
- Financial Reporting: Generate reports to assess the financial performance of an organization
- Fixed Asset Management: Centralized database to track details of fixed assets such as depreciation and maintenance scheduling/history
- For AEC Industry: Primarily serving architecture, engineering, and construction industry professionals
- For IT Project Management: Supports project management for IT professionals & teams
- For Nonprofits: Software specialized for non-profit organizations
- Forecasting: Form predictions based on past and present data/trends
- Forms Creation & Design: Create and design new forms from scratch using templates and design tools, or scan and convert existing forms into the system
- Forms Management: Store, manage and track all forms in a centralized location
- Full Text Search: Search for specific words or phrases within a document or database
- Functions/Calculations: Perform various mathematical calculations using the data
- Gantt/Timeline View: Visual representation of project's schedule, sequence and duration of tasks, benchmarks and dependencies
- Generative AI: Use AI to generate content in the form of text, images, videos, etc.
- Goal Management: Allows employees to set and manage work or career related goals
- Goal Setting/Tracking: Establish measurable goals and objectives and track their progress over a specific period of time
- Graphical Workflow Editor: Create, design and modify the flow and processes of tasks in a project
- Guest Access: Allow guests to view the software and interact with users
- Historical Reporting: Information, data and reports that are being tracked over time
- HR Management: Automates core HR functions such as talent management, employee evaluation and learning management
- Idea Management: Create, collect, discuss, improve, and evaluate insights or alternative thinking before starting projects
- Ideation: The creation, development, and sharing of potentially innovative new ideas
- Image Editing: Edit, touch up, and convert images for publishing
- Incident Management: Manage and track all disruptions and incidents
- Incident Reporting: Report and update incidents related to health or workplace injuries that occur on a job or en route to a job site
- Interaction Tracking: Track interaction history by documenting conversations for contacts
- Interactive Elements: Various components within a system including buttons, clickable icons, hover effects, and more
- Internal Controls Management: Ensure internal objectives and compliance with policies are met
- Inventory Management: Track and manage inventory levels to maintain proper supply
- Inventory Tracking: Track and monitor inventory items, such as raw materials, unfinished goods, and ready-to-sell items
- Invoice Management: Captures invoice data and maintains comprehensive records for auditing and reporting purposes
- Issue Management: Identify and respond to unexpected problems or failures (ie. "negative events")
- Issue Scheduling: Schedule and assign issue completion dates and/or times
- Issue Tracking: Record and follow the progress of every issue
- IT Asset Management: Managing inventories and tracking changes to hardware and software configurations
- IT Risk Management: Manage risks related to IT systems
- Iteration Management: Planning out the structure and duration of repetitive intervals of time dedicated to specific tasks during the development cycle
- Job Management: Manage and track all job information and associated tasks
- Kanban Board: Visualization tool to organize and optimize tasks and track their status at every stage of workflow
- Key Performance Indicators: Quantifiable metrics to track objectives, gauge milestones, and evaluate the success of a particular activity
- Knowledge Management: Gather, organize, share, and analyze knowledge in terms of resources, documents, and people skills
- KPI Monitoring: Tracking the status of previously identified performance measurements
- Labor Forecasting: Predict labor requirements based on past and present data/trends
- Learning & Development: Facilitate training materials that help employees grow and progress in their positions
- Leave Tracking: Manage and track employee attendance
- Legal Risk Management: Manage the risk of both financial and reputational loss resulting from nonadherence to current legislation
- Lifecycle Management: Manage the end-to-end lifecycle, from initial setup/development to deployment and maintenance
- Log Collection: Collects and aggregates data from various systems within the IT environment
- Maintenance Scheduling: Schedule predetermined or ad hoc maintenance services and labor requests
- Marketing Automation: Automate workflows and trigger campaigns based on customer actions
- Marketing Calendar: See past and upcoming campaigns and communications in a calendar view
- Marketing Reports: Reports specific to marketing and associated campaigns
- Media Planning: Identify advertising and promotional sources to be used in marketing efforts
- Meeting Management: Manage the process of planning and scheduling meetings, including agenda creation
- Messaging: Communicate using messages within the system
- Milestone Tracking: Monitor task progress and planned accomplishments to better manage project status
- Mobile Access: Access software remotely via mobile devices
- Mobile App: Access the system via a mobile application
- Mobile Dashboards: View and present dashboard on mobile devices
- Monitoring: Observe and track the demand, usage, progress or quality of a system, product, or user
- Multi-board: Supports simultaneous creation and work on multiple Kanban boards
- Multi-Campaign: Manage multiple campaigns in one system
- Multi-Channel Campaigns: Allows for businesses to run a variety of different campaigns across different channels
- Multi-Channel Communication: Allows communication with customers or users via multiple channels such as phone, email, live chat, etc.
- Multi-Department/Project: Manage the accounting and financial aspects of multiple operations and departments or ongoing projects from a single location
- Multi-Language: Manage and support multiple languages
- Multi-Location: Manage and support multiple locations
- Multiple Data Sources: Allows users to manage data from a number of sources
- Multiple Projects: With this capability, you can manage, view, and track numerous projects simultaneously using dashboards, folders, and Gantt charts. Users think Wrike makes it easy to switch between projects, balance workloads, and maintain organization, though some mention the interface can get overwhelming with many projects.
- Negative Feedback Management: Identify, track, and respond to negative feedback
- Network Diagram: Diagram that depicts connections among nodes in a network
- No-Code: Drag and drop/visual interfaces that allow non-tech users to build without writing code
- Onboarding: Process of familiarizing new clients, stakeholders or employees with the company, a new location, or a service
- Online Time Tracking: Track employee and task times using internet connection
- Operational Risk Management: Manage risk that occurs from systems failure or inadequate processes
- Order Management: Manage and track customer orders for goods, investments, or any other purchases
- Overtime Calculation: Manage and record overtime hours for hourly employees
- Percent-Complete Tracking: Level of completion within a task
- Performance Management: Organize and manage the accomplishments and development of employees or performance of applications or systems
- Performance Metrics: A set of indicators that tracks the performance of networks, applications, systems, teams, etc.
- Permit Management: Manages, automates, stores, and tracks permits to ensure regulatory compliance for multiple industries
- Policy Management: Create, manage, and track policies and procedures within an organization
- Portfolio Management: Overview of all programs that help compare initiatives, align projects with strategic goals and identify risk
- Predictive Analytics: Predict future data based on historical data sets
- Prioritization: Arrange tasks based on the level of priority or urgency
- Private Dashboards: Share dashboard screen within private user groups
- Product Roadmapping: Identifying desired outcomes and important milestones and creating a plan on how to achieve them
- Production Management: Manage the end-to-end production process for manufacturing operations
- Productivity Analysis: Statistical data that helps identify improvement areas, delays or interruptions, and output of an employee
- Productivity Tools: Tools to facilitate the production of information and promote efficiency
- Progress Reports: Document and report the progress of ongoing projects
- Progress Tracking: Reporting on how each user, task or process has advanced since its initiation
- Project Accounting: Manage and track financials on a project-to-project basis
- Project Management: Plan and coordinate all the resources, costs and time needed to execute assignments
- Project Planning: Organize and schedule projects
- Project Planning/Scheduling: Wrike helps you plan and schedule projects with tools like Gantt charts, timelines, and dashboards. Reviewers appreciate the structured organization, flexible scheduling, and real-time progress tracking, but some wish for better export options and deeper integrations with Google Calendar.
- Project Scheduling: Identifying critical tasks that make up a project and assigning start and end dates for each
- Project Templates: Pre-designed project plans that can be customized
- Project Time Tracking: Measure time to completion or hours worked for projects
- Project Tracking: Monitor the progress of projects from start to finish
- Project Workflow: Create, manage, or update project workflows.
- Projections: Estimate or forecast of a future scenario based on the study of present trends
- Proposal Generation: Create proposals based on costs of labor and materials
- Public Dashboards: Publish dashboard publicly on various platforms
- Pull Planning: Starting with the end goal and working backward milestone by milestone toward the start
- Purchase Order Management: Create, send, and track purchase orders and their statuses
- Purchasing & Receiving: Workflows that help acquire inventory, issue purchase orders and receive and store items in required quantity
- Quality Management: Focuses on improving processes by collecting data and spotting bottlenecks or other challenges.
- Quotes/Estimates: Generate quotes or estimates for customers
- Real Time Editing: Preview and make real-time changes in the web content
- Real-Time Analytics: Analyze and gain insights into data in real-time
- Real-Time Chat: Engage in direct, instant messaging with customers, users, etc.
- Real-Time Data: Receive data and information in real time
- Real-Time Monitoring: Active monitoring of systems, applications, or networks
- Real-Time Notifications: Notifications that are delivered to users as soon as an event occurs
- Real-Time Reporting: Active reporting of data and metrics
- Real-Time Updates: Receive system updates as soon as any changes are made
- Recruitment Management: Tools to find, assess, and hire suitable candidates for a job within an organization
- Recurring Appointments: Schedule repeating appointments based on a duration of time
- Recurring Issues: Set an issue to repeat
- Recurring Tasks: Set the frequency of a task's occurrence
- Release Management: Planning, scheduling, and overseeing the release of software or system changes into a live or production environment
- Release Planning: A timeline for taking a project live that outlines what features should be operational at the go-live date
- Remediation Management: Identify and orchestrate execution of actions needed to restore systems to optimal conditions
- Reminders: Timed notification for any upcoming task, deadline, appointment, or activity
- Remote Support: Provide support to your customers and employees remotely over a shared network
- Reporting & Statistics: Collection, analysis, and representation of numerical data and generation of reports to understand various patterns
- Reporting/Analytics: View and track pertinent metrics to find patterns and gain insights from data
- Reporting/Project Tracking: Track task progress, milestones, delays, or other key information and generate reports on them for evaluation
- Reputational Risk Management: Identify, monitor, and assess risks to brands
- Request Management: Evaluating and prioritizing change requests that are received while working on the project
- Requirements Management: Enables creation, management, and tracking of product requirements & features during product production/development
- Resource Allocation: Assign available resources to various projects and tasks
- Resource Allocation & Planning: Assign available resources (human and/or non-human) to various projects and tasks
- Resource Management: Process of planning, scheduling and executing the optimal and effective use of human capital across projects
- Resource Request: Approve or reject incoming requests for resources based on need and user permissions
- Resource Scheduling: Allocate and manage resources, such as employees, equipment, facilities, and other assets
- Response Management: Planning and managing of resources and procedures to mitigate the impact of events and incidents
- Retrospectives Management: Coordinating stand-up meetings where team members reflect on past processes to identify strengths and areas for improvement
- RFI & Submittals: Organizes and stores history of RFIs (request for information) & submittals, tracks date/time and whether a response has been received
- Risk Alerts: Notifying as a warning or reminder of a potential or imminent hazard
- Risk Analysis: Analyze potential risks across the organization
- Risk Assessment: Initiate collection and analysis of known risks
- Risk Management: Process of identifying, evaluating, mitigating, addressing and reporting on potential risks or uncertainties
- Risk Reporting: Reporting of risks associated with specific actions, events, or entities
- Risk Scoring: Assess and score risks using risk matrices
- Roadmapping: Identifying desired outcomes and important milestones and creating a plan on how to achieve them
- ROI Tracking: Monitor conversion rates and analyze effectiveness and profitability of marketing efforts
- Role-Based Permissions: Set & manage permission levels based on user roles and restrict access to only authorized individuals
- Routing: Plan daily routes to optimize employee scheduling and provide directions
- Rules-Based Workflow: Automates and streamlines business processes by creating a sequence of predefined rules and actions that govern the flow of work
- Sales Reports: Reports specific to sales analysis for trends and strategies
- Scheduled/Automated Reports: Set a time to generate routine reports automatically
- Scheduling: Plan availability and assign specific time slots for tasks and resources
- Search/Filter: Search and filter data across systems to locate required information by entering keywords or certain criteria
- Secure Data Storage: Securely stores data to prevent data loss or breaches
- Self Service Data Preparation: Access, combine, transform, and store data without the help of an IT department
- Self Service Portal: Online portal through which end users can access the system, manage tasks, or obtain information
- Service Level Agreement (SLA) Management: Set and monitor service level agreements to ensure timely response and resolution
- Sick Leave Tracking: Track and manage sick leave time
- Single Page View: Display aggregated data points on one page for a bird's eye view assessment
- Single Sign On: Allow users to access multiple services after entering their login credentials once
- Skills Tracking: Track employee skills, competencies, training & qualifications
- Spend Management: Track the amount of money spent on a certain product or with a certain supplier
- Spreadsheet View: UI looks like a spreadsheet
- Sprint Planning: Identifying the tasks to be completed and the people to complete them during a set period of time
- SSL Security: Security protocol that ensures secure, encrypted communication over the internet, safeguarding sensitive data from unauthorized access
- Staff Calendar: Track staff hours through a calendar view
- Status Tracking: Track the status over time for a request, process, asset, or transaction
- Strategic Planning: At a high level, visualize a preferred outcome, define goals and identify specific steps to achieve them
- Sub-Task Management: Split and manage tasks into individual components
- Subcontractor Management: Track information, qualifications, and contact details of subcontractors
- Succession Planning: Planning, tracking and developing internal talent for future key position filling
- Supplier Management: Manage all supplier data and operations
- Support Ticket Management: Allow customers/users to submit support queries and service requests
- Supports Scrum: Ability to accommodate the methodology that incorporates frequent work reassessment and continuous short periods of focused work.
- Surveys & Feedback: Gauge satisfaction and receive information for improvement and success
- Tagging: Attach digital tags to documents and assets for identification, search, or monitoring purposes
- Task Board View: UI looks like task board
- Task Editing: Edit task information and all related elements
- Task Import: Import tasks from external sources
- Task Management: Wrike offers you a comprehensive way to organize, assign, and track tasks, including subtasks, deadlines, priorities, and attachments. Reviewers appreciate the intuitive interface, real-time updates, customizable workflows, and the ability to collaborate and share tasks easily across teams.
- Task Progress Tracking: Wrike enables you to monitor task and project progress with real-time updates, custom workflows, and dashboards. Reviewers indicate this aspect provides clear visibility, accountability, and helps identify bottlenecks, but some wish for more automation and easier status customization.
- Task Scheduling: It gives you flexible options to schedule, assign, and set deadlines for tasks, including recurring and dependent tasks. Some reviewers find scheduling intuitive and helpful for meeting deadlines, though a few mention limitations with automation and recurring subtasks.
- Task Tagging: Add labels or tags to tasks
- Team Management: Organizing a group of people to accomplish a task
- Template Management: Create, save, and re-purpose templates for emails, forms, etc.
- Templates: Sample files or documents that could be customized as needed or used as is
- Testing/QA Management: Checking for errors to prevent quality issues and maintain the integrity of the product/service as per set standards
- Text Editing: Edit text as needed
- Third-Party Integrations: Set up connections to third-party platforms to improve business processes
- Ticket Management: Track, manage, or resolve user requests and IT incidents/issues
- Time & Attendance: Track and manage employee's work hours to improve payroll accuracy
- Time & Expense Tracking: Log and record hours worked and costs spent to assist in billing and invoicing
- Time Off Requests: Tools that allow employees to request/schedule time off
- Time Tracking: Measure and track time including hours worked and paid time off (PTO)
- Time Tracking by Project: Track time worked per project
- Timeline Management: Manage a detailed schedule of a product plan
- Timesheet Management: Track the amount of time spent on a job or task
- To-Do List: A digital list of items that need to be completed
- Traceability: Track and document the history, application, or location of an item or activity
- Traditional Methodologies: Sequential approach (i.e. Waterfall) in which users break down and plan an entire project before the launch
- Training Management: Track employee/learner's progression through training programs
- Trend/Problem Indicators: Visually identify direction of development and areas that require attention
- Uptime Reporting: Track the availability time for a designated network or website over a given period of time
- User Management: Manage user accounts, profiles, roles, permissions, and other details across applications, devices or networks
- Utilization Reporting: Track the frequency of asset usage
- Vacation/Leave Tracking: Request, track, and manage time off requests and vacation time
- Vendor Management: Ability to track and store all vendor-related information, such as contacts, services offered, terms, etc.
- Video Support: Supports various video file formats
- Visual Analytics: Interact with data visualization elements, such as charts and graphs, to drill down into data
- Visual Workflow Management: Create, design, and visually represent processes within the software
- Visualization: Graphical representation of data or processes
- Whiteboard: Allows multiple users to simultaneously annotate on a digital whiteboard
- Widgets: An extended application or connector that enables users to perform additional services with their current set of tools
- Work Order Creation: Create a new work order
- Work Order Management: Creating, assign, and track jobs and/or tasks for work orders
- Workflow Automation: Streamlining repetitive tasks and activities through automated and predefined workflows
- Workflow Configuration: Alter the default workflow to meet your organization's needs
- Workflow Management: Create, design and manage workflows for repetitive tasks

---

Get Advice

We can help you find the software with the features you need.

Features

4.3 (2,563)

4.3

Based on 2,563 reviews

## Pricing

Value for money

4.2 (1980)

Free Trial

Free Version

[View pricing plan details](https://www.capterra.com/p/76113/Wrike/pricing/)

Team

$10.00

Per User,Per Month

It includes:

-   2-15 users
-   Custom fields and workflows
-   Interactive Gantt charts
-   Shareable dashboards
-   AI Essentials

Business

$25.00

Per User,Per Month

It includes:

-   5-200 users
-   AI Elite features
-   Templatize your work
-   Standard integration
-   Resource and capacity planning
-   Workflow customizations
-   Paid add-on: Wrike Whiteboard
-   Paid add-on: Wrike Integrate
-   Paid add-on: Wrike Sync

Pinnacle

Custom Quote Available

It includes:

-   5 to unlimited users
-   Advanced resource and capacity planning
-   Budgeting (track financials)
-   Advanced reporting and BI
-   Single sign-on SSO
-   Advanced Security and compliance
-   Paid add-on: Wrike Whiteboard
-   Paid add-on: Wrike Integrate
-   Paid add-on: Wrike Datahub
-   Paid add-on: Wrike Sync

Apex

Custom Quote Available

It includes:

-   Unlimited Whiteboards
-   Paid add-on: Wrike Lock
-   5 to unlimited users
-   AI Elite features
-   Wrike Datahub (30M records)
-   Bi-directional integrations with third-party solutions with Wrike Sync
-   Integrations and automations with Wrike Integrate

Value for money

4.2 (1,980)

4.2

Based on 1,980 reviews

## Integrations

[

Google Workspace](https://www.capterra.com/p/247901/Google-Workspace/)[

Slack](https://www.capterra.com/p/135003/Slack/)[

Trello](https://www.capterra.com/p/211559/Trello/)[

Dropbox](https://www.capterra.com/p/143068/Dropbox-Business/)[

Microsoft Excel](https://www.capterra.com/p/176574/Excel/)[

Salesforce Sales Cloud](https://www.capterra.com/p/61368/Salesforce/)[

Jira](https://www.capterra.com/p/19319/JIRA/)[

WordPress](https://www.capterra.com/p/131687/WordPress/)

Connect with a Capterra advisor for a free 15-minute consultation

Get a personalized software list aligned to your business needs with guidance from our expert advisors. Our team has helped 1 million+ businesses like yours find options that fit their needs.

## Support, customer service and training options

Customer Service

4.3 (2134)

Support

-   Email/Help Desk
-   FAQs/Forum
-   Knowledge Base
-   Phone Support
-   24/7 (Live rep)
-   Chat

Training

-   In Person
-   Live Online
-   Webinars
-   Documentation
-   Videos

Deployment

-   Web
-   Android
-   iPhone/iPad

Typical users

-   Freelancers
-   Small businesses
-   Mid size businesses
-   Enterprises

Customer Service

4.3 (2,134)

4.3

Based on 2,134 reviews

## User reviews

Overall rating

4.4

Based on 3,046 reviews

Filter by rating

Counts reflect reviews available in this feed.

5(1576)

4(1136)

3(237)

2(57)

1(40)

Mentioned topic

Recent reviews first, then most helpful

Ashutosh H.

Senior Executive

Used the software for: 1-3 years

### "Wrike Keeps Our Work Organized and the Team Aligned"

4.0

November 5, 2026

Wrike helps me keep workflows structured, priorities clear, and tasks moving in the right direction. I rely on it every day to track progress, stay aligned with my team, and make sure time is spent on the right work instead of chasing updates across multiple platforms. Overall, it makes my day-to-day work far more organised and efficient.

Pros

What I like most about Wrike is how it keeps everything organized in one place. It gives the team clearer visibility into tasks, timelines, and workflows, so everyone stays aligned without needing to constantly follow up or bounce between emails, Teams, and SharePoint. With everything easy to access and well organized, the overall workflow feels smoother and more efficient.

Cons

At times, Wrike can feel a bit cluttered, and it will occasionally hang or take longer to load, especially when I’m switching between networks. It doesn’t happen often, but when it does, it can interrupt my workflow. Notifications can also become overwhelming, and when there’s a lot of information to sift through, navigating the interface or locating specific tasks isn’t always as straightforward as I’d like.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

RE

Reviewer

Attorney

Used the software for: 3-5 years

### "Deadline spreadsheets to one shared case calendar."

5.0

Overall Rating

5.0

5.0

Ease of Use

5.0

5.0

Features

5.0

5.0

Customer Service

4.0

4.0

Likelihood to Recommend

8/10

November 3, 2026

Before this, our client deadlines lived across four lawyers' inboxes and a shared spreadsheet nobody updated consistently. Now everything sits in one dashboard our whole small firm actually checks each morning. Support answered my setup questions quickly when I was configuring approval workflows for contract reviews. I'd recommend it without hesitation to any small legal practice tired of chasing status updates.

Pros

The moment I stopped chasing three associates for status updates on filing deadlines, I knew this was worth it. Every matter now has its own folder. Tasks are assigned, due dates are right there in front of us, and nobody is missing a court filing because a sticky note got lost.

Cons

Generating invoices still means exporting time logs into our billing software separately, which feels like an extra step we shouldn't need. The mobile app notifications lag sometimes when I'm at the courthouse checking a task between hearings. Small annoyance, not a dealbreaker for how we run the office.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

Marion P.

Solution Deployment Manager

Used the software for: Less than 1 year

### "Wrike for Implementation Projects"

4.0

November 2, 2026

Pros

Highly flexible dashboard, easy task tracking, automation to facilitate global overview of ongoing project and facilitate customer support.

Cons

Volume of data is not always easy to navigate through, missing real time time tracking tool, timesheet manual entry can feel cumbersome.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

KK

Karen\_ K.

Finance and Accounting Specialist

Used the software for: 3-5 years

### "Managing Nonprofit Financial Work Without Losing Track"

5.0

Overall Rating

5.0

5.0

Ease of Use

5.0

5.0

Features

5.0

5.0

Customer Service

5.0

5.0

Likelihood to Recommend

10/10

October 14, 2026

Wrike helps me coordinate financial responsibilities and meet reporting deadlines without constantly chasing colleagues for updates. It gives me a clearer view of outstanding tasks, pending approvals, and the financial information each programme still needs to provide.

Pros

Wrike helps me organise financial reporting, track expense approvals, and manage budget-related tasks across different nonprofit programmes. I can assign work to colleagues, set deadlines, and monitor progress, which is useful when several departments need to submit financial information at the same time.

Cons

Wrike takes some time to set up properly, especially when organising workflows for different financial activities. I also need separate accounting software for handling transactions and preparing detailed financial statements.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

RE

Reviewer

Accounts Payable Associate

Used the software for: 3-5 years

### "Wrike = Another PPM System that I Highly Recommend to All Business Users"

4.0

Overall Rating

4.0

4.0

Ease of Use

5.0

5.0

Features

4.0

4.0

Customer Service

4.0

4.0

Likelihood to Recommend

8/10

October 13, 2026

Pros

I appreciate that Wrike has an iOS mobile application that is highly customizable compared to most alternatives. It is possible to track, plan and manage tasks while on the go with Wrike.

Cons

Apart from the lack of built-in instant messaging and live chat feature in Wrike, I do not feel like there’s any other existing bug.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

RE

Reviewer

Business Owner

Used the software for: 3-5 years

### "Wrike = Remarkable PPM Program for Everyone and Business"

5.0

Overall Rating

5.0

5.0

Ease of Use

5.0

5.0

Features

5.0

5.0

Customer Service

5.0

5.0

Likelihood to Recommend

10/10

October 5, 2026

Pros

Wrike is the most robust project portfolio management tool that I have ever used. I like that it automates complex repetitive task and project management processes.

Cons

I use both cloud and on-premise Wrike systems across mobile and PC devices and I do not fail to accomplish my needs due to an unfixed error.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

Bob F.

CEO

Used the software for: Less than 1 year

### "Wrike-Powerful project management platform with a strong learning curve."

4.0

Overall Rating

4.0

4.0

Ease of Use

4.0

4.0

Features

3.0

3.0

Customer Service

3.0

3.0

Likelihood to Recommend

6/10

September 27, 2026

Overall, my experience with Wrike has been exceptionally positive. While it requires an upfront investment of time to properly configure and get my team fully onboarded, the long-term payoff is well worth it. It transformed how our team manages complex projects, eliminating communication silos and providing the high-level visibility needed to keep everyone aligned and moving forward efficiently.

Pros

What I liked most about Wrike is its exceptional ability to bring clarity and structure to complex workflows through real-time visibility, customizable dashboards, and robust task tracking. The centralized collaboration tools and interactive Gantt charts make it effortless to align cross-functional teams, monitor workloads, and keep everyone accountable without getting bogged down by endless status meetings.

Cons

While Wrike is a powerful platform, the steepest hurdle is its initial learning curve and complex configuration process. Setting up custom workflows, folders, and dashboards to fit a team's exact needs can feel overwhelming for new users and often requires dedicated time to master. Additionally, the pricing structure can become quite steep for smaller teams or growing businesses as you add advanced features.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

RE

Reviewer

Graphic Designer

Used the software for: 3-5 years

### "My Tool for Managing Production Projects"

5.0

Overall Rating

5.0

5.0

Ease of Use

5.0

5.0

Features

5.0

5.0

Customer Service

5.0

5.0

Likelihood to Recommend

10/10

September 23, 2026

Pros

Clear project organization, useful task and deadline tracking, good team collaboration, practical project dashboards, and helpful visibility into the progress of my production projects.

Cons

The interface can feel a little complex at first, the number of features may be overwhelming, some advanced options require time to learn, and notifications can sometimes become too frequent.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

AS

Adewale Samuel A.

HIO

Used the software for: 3-5 years

### "Continuous Improvement"

4.0

Overall Rating

4.0

4.0

Ease of Use

4.0

4.0

Features

4.0

4.0

Customer Service

4.0

4.0

Likelihood to Recommend

9/10

September 8, 2026

Overall, I think that Wrike is great. I have not had any issues since I have been using Wrike, and most of my colleagues say the same. I think there is always room for improvement, and Wrike might want to employ on-site data collection during troubleshooting to gather feedback for improvement.

Pros

I would say that Wrike has been a business partner, as I would have been able to achieve very little without Wrike in terms of managing my everyday workload and sorting things out. The AI intuition is additional support and an exceptional feature added to the platform.

Cons

Very few cons on Wrike. Sometimes, I might need a bigger screen to get going, but I think this is something I need to sort out rather than blaming Wrike for it.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

Geeta K.

Digital Marketing Executive

Used the software for: Less than 1 year

### "Great for keeping marketing work organized"

5.0

Overall Rating

5.0

5.0

Ease of Use

5.0

5.0

Features

4.0

4.0

Customer Service

5.0

5.0

Likelihood to Recommend

9/10

August 25, 2026

Before Wrike, we used to share campaign updates and tasks via chat, email, and spreadsheets. Wrike has helped us centralize everything and meet deadlines more effectively. It has also reduced the need to constantly ask team members for status updates, saving time during busy campaigns.

Pros

I like being able to keep campaigns, content-related tasks, deadlines, and team updates all in one place. It makes it easy to see what work is pending and who is doing what. Task tracking and shared project views are excellent for SEO and social media, especially since we often have multiple projects or tasks running simultaneously.

Cons

It took me a little while to get the hang of all the options and views. If you are working on a small project, some sections might feel like overkill.

Review source

Non-incentivized review: any software user can leave a review for any product listed on our site. All submitted reviews are subject to our verification process prior to publication.

[View all Reviews](https://www.capterra.com/p/76113/Wrike/reviews/)

## Top-rated software of 2026

### Fill out the form and we'll send a list of the top-rated software based on real user reviews directly to your inbox.

Popular comparisons

[Jira vs Wrike](https://www.capterra.com/compare/19319-76113/JIRA-vs-Wrike)[Asana vs Wrike](https://www.capterra.com/compare/76113-184581/Wrike-vs-Asana-PM)[monday AI Work Platform vs Wrike](https://www.capterra.com/compare/76113-147657/Wrike-vs-monday-com)[Trello vs Wrike](https://www.capterra.com/compare/76113-211559/Wrike-vs-Trello)[Clockify vs Wrike](https://www.capterra.com/compare/76113-169607/Wrike-vs-Clockify)[ClickUp vs Wrike](https://www.capterra.com/compare/76113-158833/Wrike-vs-ClickUp)[Notion vs Wrike](https://www.capterra.com/compare/76113-186596/Wrike-vs-Notion)[Smartsheet vs Wrike](https://www.capterra.com/compare/76113-79104/Wrike-vs-Smartsheet)[Basecamp vs Wrike](https://www.capterra.com/compare/56808-76113/Basecamp-vs-Wrike)[Zoho Projects vs Wrike](https://www.capterra.com/compare/76113-169455/Wrike-vs-Zoho-Projects)

[GitHub vs Wrike](https://www.capterra.com/compare/76113-129067/Wrike-vs-GitHub)[Confluence vs Wrike](https://www.capterra.com/compare/76113-136446/Wrike-vs-Confluence)[Celoxis vs Wrike](https://www.capterra.com/compare/5923-76113/Celoxis-vs-Wrike)[Airtable vs Wrike](https://www.capterra.com/compare/76113-146652/Wrike-vs-Airtable)[Todoist vs Wrike](https://www.capterra.com/compare/76113-149339/Wrike-vs-Todoist-for-Business)[Miro vs Wrike](https://www.capterra.com/compare/76113-128955/Wrike-vs-Miro)[Nifty vs Wrike](https://www.capterra.com/compare/76113-172519/Wrike-vs-Nifty)[Any.do vs Wrike](https://www.capterra.com/compare/76113-173614/Wrike-vs-Any-do)[Teamwork.com vs Wrike](https://www.capterra.com/compare/76113-120390/Wrike-vs-Teamwork-Projects)